Manufacturing facilities
Machine list, active lines, product classes, construction samples, and available windows.
Managed private label · structured intake
A sourcing brief connects product intent to fabric, construction, facility capability, and commercial scope. Fenalt coordinates review through a managed production network; the result depends on order-specific fit and availability.
MOQ
50 pieces per style, subject to style and materials
Sample production
10–15 days, plus 3–5 days for express courier
Bulk production
15–20 days after formal PP sign-off
Quality reference
ANSI/ASQ Z1.4 Level II; AQL 2.5 major defects
Delivery basis
DAP express courier for samples; FOB Chattogram for bulk
Buyer brief
This sequence organizes the work. Sampling and production timing are planning references; confirm the dates for your order.
Share the tech pack, material target, GSM, measurements, quantity, and delivery window.
The brief is translated into production requirements and assessed for network fit.
Sampling follows review of materials, lab dips or strike-offs, pattern, construction, and physical prototype.
PP sample, trims, final tech pack grading, POM tolerances, and inspection criteria are recorded before bulk.
Network profile
The network includes specialized manufacturing units, textile suppliers, and holders of documented surplus. Submission begins review and does not establish qualification.
Machine list, active lines, product classes, construction samples, and available windows.
Fiber, yarn, GSM, finish, color consistency evidence, and available material.
Itemized export surplus with packing details, origin evidence, and inspection access.
Tech pack, measurements, seam construction, trims, and physical sample requirements.
Composition, GSM, yarn, finish, color references, and batch consistency needs.
Style and color quantities, target dates, delivery basis, and approval milestones.
Facility profile, active lines, legal and safety records, construction examples, or stocklot documents.
Common questions
No. A technical review considers product parameters, volume, material, schedule, and available facility fit. Submission does not guarantee a match, order, allocation, or production quantity.
Send the tech pack, fabric composition and GSM, POM table, trims, target quantity, colorways, testing criteria, and intended delivery window.
Qualification includes document screening, facility audit, trial sampling and stitch assessment, followed by network review. Evidence and scope should fit the facility and brief.
Prepare legal, structural, safety, environmental, and social-compliance records, but does not identify a verified list of accepted third-party certificates. Confirm required documents for the case.
No universal supplier settlement schedule is stated. Payment and other commercial terms are agreed for the specific purchase order and recorded in its documents.
Yes. Private-label sourcing briefs and facility profiles are both accepted for review. Supplier capacity can be reviewed, but submitting it does not guarantee buyer access or allocation.
Private label intake
Include your buyer requirements or supplier capability, with the documents needed for technical review.
Start a sourcing request