Start Your Project

Supplier network and production partnerships

Become a Fenalt Manufacturing or Supply Partner

Fenalt builds a technical, accountable supplier network for brands that need reliable garment, fabric, and verified stocklot execution.

Onboarding is a capability and compliance process, not a directory listing. We look for partners that can provide evidence, meet a brief, and operate transparently.

Network architecture

Four phases from application to integration

  1. 01

    Category selection

    Apply as a cut-and-sew factory, fabric mill, or stocklot holder.

  2. 02

    Technical capability

    Show product categories, machines, materials, capacity, and sample quality.

  3. 03

    Compliance and safety

    Provide business, safety, quality, and ethical operating evidence.

  4. 04

    Trial and integration

    Complete evaluation, trial work, and project-specific matching before live allocation.

Who can apply

Three supplier profiles

The evidence changes by supplier type, but every applicant must make its capability legible and verifiable.

Garment factories

Cut-and-sew categories, machines, monthly capacity, sample room, export experience, QC system, and production photographs.

Fabric mills

Fiber and yarn capability, knit or woven constructions, GSM and width range, dyeing and finishing, test evidence, and lot minimums.

Stocklot holders

Lot origin, quantity, size curve, GSM, packaging, grading, brand permissions, inspection evidence, and export documents.

Evidence

Prepare the records that prove the claim

A complete application reduces verification time and gives the Fenalt team a realistic basis for project matching.

Business and export

Registration, address, ownership, export experience, and contact details.

Safety and compliance

Factory or mill safety, ethical operating, environmental, and compliance records.

Quality system

QMS description, inspection records, AQL experience, testing, and corrective-action process.

Representative samples

Stitch samples, fabric swatches, product photographs, or verified stocklot evidence.

Submit actual evidence and note any scope limits; unsupported claims slow the evaluation.

Evaluation

A four-stage capability review

  1. 01

    Document review

    Fenalt checks the submitted profile, category fit, evidence, and completeness.

  2. 02

    Capability verification

    Technical claims, facility information, sample work, capacity, and quality controls are examined.

  3. 03

    Trial assessment

    A trial or sample program is evaluated against the approved brief, with typical trial timing of 10–15 days.

  4. 04

    Network decision

    Successful partners are matched to appropriate briefs only after capability, compliance, and commercial fit are clear.

Project matching

Capability must meet the brief

Onboarding does not guarantee a project. Fenalt matches approved partners to the technical and commercial requirements of each buyer.

Category fit

Product or material capability matches the brief.

Capacity and timing

Available line time and lead time fit the approved schedule.

Quality and ethics

Performance, compliance, and operating standards meet the project.

Project matching commonly requires 15–20 days once the capability, compliance, and brief information are complete.

Application sequence

How to submit

  1. 01

    Prepare the company, capability, compliance, and sample information.

  2. 02

    Submit the supplier profile and supporting evidence through the onboarding route.

  3. 03

    Respond to technical questions or verification requests from the Fenalt team.

  4. 04

    Complete any approved trial and agree the project-specific operating terms.

Commercial and ethical terms

Fenalt works through formal, transparent purchase orders and individual contracts. Project delivery can be structured around FOB Chattogram or DAP terms where that route is approved, with clear specifications, inspection responsibilities, and documentation.

Questions and answers

Supplier onboarding FAQs

Who can apply to the Fenalt network?

Garment factories, fabric mills, and holders of verified stocklots can apply when they can provide credible technical, commercial, and compliance information.

What quality threshold is used for trial work?

Trial work is assessed against the approved specification and quality brief, with AQL 2.5 used as a standard acceptance reference where applicable.

How long does evaluation take?

Document and capability review timing depends on evidence completeness. Trial production commonly requires 10–15 days, while project matching can require 15–20 days.

What documents are required?

Submit business registration and export information, factory or mill capability details, QMS or quality records, safety and compliance evidence, and representative stitch or fabric samples.

How are suppliers matched to projects?

Matching considers product or material category, technical capability, capacity and timing, quality performance, compliance fit, location, and the buyer's approved brief.

How are commercial terms handled?

Fenalt uses formal, transparent purchase orders and individual contracts. Delivery may be planned on FOB Chattogram or DAP terms according to the project.

Begin the review

Bring your capability into focus

Send your supplier profile, category, evidence, and representative samples. Fenalt will confirm the next verification step.