Physical Inspection
Garment Quality Control Services in Bangladesh.
Protect your fashion brand reputation. Our Dhaka quality engineering team conducts in-line stitching audits, measurement curve checks (±1.5cm), needle metal detection, and final AQL 2.5 pre-shipment inspections.
Defect Prevention
Preventing Manufacturing Defect Escalation
Catching errors after bulk garments arrive in overseas distribution centers is devastatingly expensive. Defective seams, missing care labels, or crooked print alignment erode customer trust.
Fenalt catches defects on the sewing line: Our on-the-ground auditors in Dhaka physically audit in-line sewing stations, verifying stitch density, seam tension, and point-of-measure specs before carton sealing.
QC Service Pillars
Inspection Deliverables
Pre-Production Material Audit
Verifying fabric GSM, color shade consistency, and trim specs prior to pattern cutting.
In-Line Stitching Audit
Auditing seam construction, thread tension, and ±1.5cm sizing curve adherence during assembly.
Final AQL 2.5 Carton Audit
ANSI/ASQ Z1.4 statistical carton sampling, needle safety detection, and polybag label verification.
Quality Assurance
Enforcing Physical Floor Standards
Every production run undergoes strict on-site inspection before export authorization is granted.
Measurement Tolerance (±1.5cm)
Strict sizing curve control across all garments.
Needle & Metal Detection
100% safety inspection of finished pieces.
ANSI/ASQ Z1.4 Audits
Enforcing international AQL 2.5 quality benchmarks.
Questions
Garment QC FAQ
What international quality benchmarks does Fenalt follow?
We follow ANSI/ASQ Z1.4 international sampling standards, enforcing AQL 2.5 acceptable quality limits across major defect categories.
What measurement tolerances are acceptable during inspection?
Our Dhaka inspectors enforce strict ±1.5cm measurement tolerance limits against approved tech pack sizing tables.
Ensure flawless quality control on your next run
Submit your apparel specs for an all-inclusive quality-managed production quote within 24–48 hours.
Start Quality-Managed Production