Start Your Project

Physical Inspection

Factory Quality Control in Dhaka, Bangladesh.

Rigorous on-site floor supervision. We physically audit stitching, measurement curves (±1.5cm), needle detection, and AQL 2.5 final packing before export.

Ground Oversight

Why Remote Quality Reports Are Not Enough

Relying on factory self-inspections or unverified photo reports often results in unexpected defects, size chart deviations, or missing brand labels after shipments arrive overseas.

Fenalt places auditors on the factory floor: Our Dhaka staff physically checks every cut, seam, print alignment, and carton build - ensuring zero defective products leave Bangladesh.

Inspection Stages

Three-Tiered QC Process

Stage 1

Pre-Production Audit

Checking fabric GSM, color shade matching, and thread quality before pattern cutting.

Stage 2

In-Line Sewing Audit

Monitoring seam tension, stitch density, and ±1.5cm measurement tolerances during assembly.

Stage 3

Final Pre-Shipment Audit

ANSI/ASQ Z1.4 AQL 2.5 carton sampling, needle safety detection, and polybag verification.

Quality Protection

Dhaka Floor Supervision Standards

Every production run undergoes strict on-site inspection before export authorization is granted.

Measurement Tolerance (±1.5cm)

Strict sizing curve control across all garments.

Needle & Metal Detection

100% safety inspection of finished pieces.

ANSI/ASQ Z1.4 Audits

Enforcing international AQL 2.5 quality benchmarks.

Questions

Quality Control FAQ

What quality control standards does Fenalt enforce in Bangladesh?

We enforce ANSI/ASQ Z1.4 international AQL 2.5 acceptance criteria, ±1.5cm measurement tolerance curves, 100% metal needle detection, and seam tension testing.

When are QC inspections performed during production?

Our local Dhaka team conducts inspections across three stages: pre-production fabric GSM/shade audits, in-line sewing line checks, and final pre-shipment AQL carton audits.

Ensure flawless quality for your next order

Submit your apparel designs for an all-inclusive quality-controlled quote within 24–48 hours.

Start Managed QC Project