Production Relocation
Relocating Apparel Production to South Asia.
A step-by-step roadmap for fashion brands transitioning garment manufacturing to Dhaka, Bangladesh. We handle tech pack digitization, fit sampling in 10–14 days, and Dhaka floor QC.
Transition Management
Ensuring Zero Quality Interruption During Transition
Switching manufacturing facilities is often fraught with risk - lost pattern grading, altered size fits, fabric weight discrepancies, and delayed shipping windows.
Fenalt eliminates transition friction: We reverse-engineer your proven bestseller fits, match fabrics in Dhaka, and audit physical floor assembly daily to guarantee identical garment quality.
Relocation Phases
The 4-Step Transition Plan
1. Spec & Pattern Transfer
Digitizing CAD spec sheets or physical sample garments to ensure exact fit continuity.
2. 10–14 Day Fit Sampling
Constructing physical prototype fit samples in Dhaka for your hands-on evaluation.
3. Managed Bulk Production
Micro-factory sewing line setup, daily floor QC, and landed DDP freight delivery.
Quality Assurance
On-Site Floor Audits in Dhaka
We physically audit stitching, measurement accuracy, and label attachment on the factory floor before garments are approved for export.
Measurement Tolerance (±1.5cm)
Strict sizing curve control across all garments.
Needle & Metal Detection
100% safety inspection of finished pieces.
ANSI/ASQ Z1.4 Audits
Enforcing international AQL 2.5 quality benchmarks.
Questions
Relocation FAQ
How does Fenalt manage pattern transfers during factory relocation?
Our Dhaka pattern engineering team ingests your existing CAD patterns or physical sample garments, digitizing spec sheets to ensure seamless measurement continuity.
How long does a production transition take with Fenalt?
Physical sample development takes 10 to 14 days. Once sample fits are approved, bulk production takes 4 to 6 weeks followed by global DDP shipping.
Plan your apparel production transition
Submit your current tech pack specs for an all-inclusive landed quote within 24–48 hours.
Start Transition Project