Start Your Project

Outerwear · insulated construction

Build the puffer around its baffle

Shell, lining, fill, channel design and seam detail work together. Define them as one product system, then review the physical sample before confirming a bulk specification.

Construction sequence

01

Shell

02

Channel

03

Fill

04

Closure

Review each element against the garment's approved BOM and sample.

Shell and insulation options

Choose a material direction, then verify it

Denier, weight and fill ranges are specification examples. They do not certify performance of an untested product.

ComponentIllustrative specificationDevelopment check
Nylon ripstop shell20D–40D; 35–65 GSMLight shell construction option; confirm composition, finish and test criteria.
Polyester taffeta50D–75D; 70–110 GSMSmooth shell option; recycled content and any finish require order documentation.
Taslan nylon100D–160D; 130–180 GSMMore structured shell direction; confirm coating and intended use.
Synthetic micro-denier fill100–350 GSMSheet or blowable fill option; agree material identity, allocation and sample criteria.
Natural down550–800+ fill power shown as an exampleSpecify the selected fill and request current product and transaction documentation before stating any certification or performance.

Construction decisions

Translate the silhouette into a build sheet

01

Silhouette

Boxy or oversized shapes balance room for loft and layering; tailored or athletic shapes use articulated sleeves and narrower channels; longline and convertible concepts change coverage and component needs.

02

Baffle

Sewn-through horizontal or vertical channels are one construction option. Box-wall baffles add a separating wall; select the construction for the product brief and test the approved sample.

03

Needle and thread

Ballpoint needles in sizes 65/9 to 75/11 and core-spun polyester thread are listed for review. Confirm suitability against the selected shell, lining and seam sample.

04

Seam details

A 10–12 SPI reference is listed alongside seam tape, storm plackets, bar-tacks, hem shock cord, toggles and adjustable cuffs. Set acceptance criteria on the tech pack.

Construction details include TPU seam tape at selected seams, storm plackets, bar-tacks, shock-cord hem adjustment, branded hardware, embroidery or transfer decoration, labels and compression packaging. Add only the details needed for the design and confirm them on the sample.

Sampling and production

Approve the physical reference

  1. 01

    Tech pack

    Record silhouette, POMs, BOM, baffle layout, shell, lining, fill and trim.

  2. 02

    First prototype

    Review shoulder pitch, armhole clearance, loft, baffle distribution and overall shape.

  3. 03

    Pre-production sample

    Check the selected bulk materials, dye, fill allocation and decoration; sign off before production.

  4. 04

    Final inspection

    Agree lot sampling, dimensional checks and any fill, leakage, zipper or weather-related test criteria.

Order planning references

MOQ
50 pieces per style as a planning reference
Sampling
10–15 production days + 3–5 shipping days
Bulk
15–20 days after PP sample sign-off
Shipping
DAP courier; FOB at the designated export port

Planning references only. Confirm feasibility, order-specific terms and delivery scope before scheduling.

Questions

Puffer development and inspection

Which shell weights are shown as examples?

Illustrative shell options include nylon ripstop at 20D–40D and 35–65 GSM, polyester taffeta at 50D–75D and 70–110 GSM, and Taslan nylon at 100D–160D and 130–180 GSM. Treat these as material directions to validate.

Can you guarantee warmth or water resistance?

No. Insulation performance, down leakage, water resistance and seam sealing require a chosen material, test method, sample and written acceptance criteria.

What are the construction references?

Construction references include sewn-through and box-wall baffles, 65/9–75/11 ballpoint needles, core-spun polyester thread and 10–12 SPI. Confirm construction suitability and tolerances for the approved sample.

What are the planning references?

Planning references are 50 pieces per style, 10–15 days for sampling plus 3–5 days shipping, and 15–20 days for bulk after PP sign-off. Confirm timing, material availability and delivery terms per order.

How should inspection be agreed?

ANSI/ASQ Z1.4 Level II and AQL 2.5 are planning references. Set the inspection plan and define how fill, measurements, seams, trims and any performance tests will be evaluated.

Outerwear project brief

Review the shell, fill and construction together

Share the silhouette, material direction, baffle plan, target measurements, quantity and required test evidence.

Discuss a puffer project