Start Your Project

Product engineering · jersey

Build the T-shirt around the cotton specification

Fabric weight, yarn, silhouette, rib, seam construction, and certification scope need to agree. Start with a defined brief, then approve the actual sample and order documentation.

Order minimum

50 pieces

per style, subject to material confirmation

Sampling reference

10–15 days

production plus 3–5 days express courier

Bulk reference

15–20 days

after formal PP sign-off

Fabric selection

Match weight to the silhouette

Use these illustrative ranges as development options. Confirm the hand feel, shrinkage method, finish, and actual fabric lot in sampling.

WeightFabricYarn referenceTypical direction
140–160 GSMCombed compact cotton30s–40sLightweight, tailored silhouettes
180–210 GSMRing-spun cotton24s–30sRegular weight T-shirts
240–300 GSMCarded or combed cotton16s–20sOversized and boxy silhouettes
180–220 GSM95% cotton / 5% elastaneAs specifiedStretch jersey option
150–180 GSMSlub cottonAs specifiedTextured jersey option

Shape and rib

Silhouette sets proportions

Tailored / slim

140–160 GSM

fabric weight

Rib width: 1.5–1.8 cm

Regular

180–220 GSM

fabric weight

Rib width: 1.8–2.2 cm

Oversized / boxy

240–300 GSM

fabric weight

Rib width: 2.5–3.5 cm

Construction file

Make the sample measurable

Use the approved tech pack to record seam, stitch, hem, and rib requirements. Confirm test method and acceptance criteria for the finished style.

Seam
Four-thread overlock, ISO 514 reference
Stitch density
10–12 stitches per inch planning reference
Sleeve and hem
Twin-needle coverstitch, ISO 406 reference
Hem depth
2.0–2.5 cm reference
Rib
Elastane rib content 3–5% where specified

Certification and organic-content claims require current documentation that matches the supplier, product, and transaction. This page does not represent that Fenalt can provide a particular certification.

Questions before sampling

Protect the product claim

Can Fenalt guarantee GOTS or OCS certified cotton?

No certification is assumed. Verify the current supplier, product scope, and transaction-specific documents before making a certified-content claim. GOTS and OCS have distinct scopes.

What should an organic cotton brief include?

State the required certification scope, fabric composition, GSM, yarn, color, finish, garment measurements, and which documents must accompany the order.

What are the silhouette weight references?

Illustrative weight ranges are 140–160 GSM for tailored or slim tees, 180–220 GSM for regular tees, and 240–300 GSM for oversized or boxy tees. Treat these as starting points for a sample.

How should print claims be handled?

Confirm the available print method and order-specific evidence with the supplier. Do not describe ink or a finished garment as GOTS certified unless current documents support that specific claim.

What are the sample and bulk planning windows?

Planning references are 10–15 days for sample production plus 3–5 days for express courier, and 15–20 days for bulk after formal PP sign-off. Confirm the schedule for the actual order.

How is quality assessed?

Agree the POM tolerances, wash-test method and acceptance criteria, inspection scope, and defect definitions. ANSI/ASQ Z1.4 Level II with AQL 2.5 major defects is a planning reference, not a substitute for those details.

Development brief

Set the fabric and evidence requirements

Share the silhouette, fabric target, construction file, certification scope, and order quantity.

Discuss T-shirt development