Circular knits
Tirupur
T-shirts, sweatshirts, combed cotton jersey, and terry constructions.
India · private label
Private label production is easier to scope when the product, fabric, process, and regional capability are considered together. Fenalt coordinates the brief and managed production review through partner facilities.
50 pieces
per style, subject to style and material review
Sampling
10–15 days
production, plus courier
Bulk window
15–20 days
after formal PP sign-off
Regional capability map
Regional product focuses are examples, not exclusive capabilities or a substitute for facility-level qualification.
Circular knits
T-shirts, sweatshirts, combed cotton jersey, and terry constructions.
Woven apparel
Woven garments, outerwear, jackets, and styles with complex embellishment.
Synthetics and blends
Synthetic and blended fabrics, including higher-density filament constructions.
From brief to bulk
Timeline figures are planning references. Confirm the calendar against order quantity, material sourcing, and supplier capacity.
Share the tech pack, size range, target quantity, material direction, trims, and intended finish.
Allow 10–15 days for sample production and 3–5 days for express courier. Confirm fit, construction, color, and measurements.
Record the approved PP sample, material references, POM tolerances, and order-specific test criteria.
Plan for 15–20 days after formal PP sign-off as a reference. Confirm material readiness and the factory schedule for the order.
Specification desk
Buyer questions
The planning reference is a 50-piece minimum per style. Confirm how colors, fabric minimums, trims, and size assortment affect a specific order.
Use 10–15 days for sample production plus 3–5 days for express courier as a planning reference. The brief and material availability can change the schedule.
Define the garment measurements and tolerances, sample approval, inspection scope, and any test method and acceptance criteria. ANSI/ASQ Z1.4 Level II with AQL 2.5 major defects is a planning reference.
Custom yarn-dyed, Pantone lab-dipped, or technical weave work can add 15–30 days. Confirm the order-dependent timing with the supplier.
Certification status is not assumed. Verify current, product-specific and transaction-specific documents with the supplier before making a certified-content claim.
Those details are not specified here. Confirm applicable tariff treatment and transit estimates with qualified trade and logistics providers for the origin, destination, product, and date.
Private label planning
Share the garment type, tech pack, material direction, quantity, and target schedule for an order-specific review.
Discuss private label production