Start Your Project

India · private label

Choose a production base around the garment

Private label production is easier to scope when the product, fabric, process, and regional capability are considered together. Fenalt coordinates the brief and managed production review through partner facilities.

Planning baseline

50 pieces

per style, subject to style and material review

Sampling

10–15 days

production, plus courier

Bulk window

15–20 days

after formal PP sign-off

Regional capability map

Start with the construction

Regional product focuses are examples, not exclusive capabilities or a substitute for facility-level qualification.

01

Circular knits

Tirupur

T-shirts, sweatshirts, combed cotton jersey, and terry constructions.

02

Woven apparel

Delhi–NCR

Woven garments, outerwear, jackets, and styles with complex embellishment.

03

Synthetics and blends

Surat / Western India

Synthetic and blended fabrics, including higher-density filament constructions.

Compare managed manufacturing approaches

From brief to bulk

A four-stage order plan

Timeline figures are planning references. Confirm the calendar against order quantity, material sourcing, and supplier capacity.

  1. 01

    Brief

    Share the tech pack, size range, target quantity, material direction, trims, and intended finish.

  2. 02

    Sample

    Allow 10–15 days for sample production and 3–5 days for express courier. Confirm fit, construction, color, and measurements.

  3. 03

    Approval

    Record the approved PP sample, material references, POM tolerances, and order-specific test criteria.

  4. 04

    Bulk

    Plan for 15–20 days after formal PP sign-off as a reference. Confirm material readiness and the factory schedule for the order.

Specification desk

Set the commercial and quality basis

MOQ
50 pieces per style
Knit construction
10–12 stitches per inch as a planning reference
Fleece and terry
280 GSM to 500+ GSM in the illustrative range
Quality plan
ANSI/ASQ Z1.4 Level II; major defects AQL 2.5
Shipping basis
DAP express courier for samples; FOB export port for bulk, agreed per order

Buyer questions

Confirm before you place an order

What does 50-piece MOQ mean?

The planning reference is a 50-piece minimum per style. Confirm how colors, fabric minimums, trims, and size assortment affect a specific order.

How long does sampling take?

Use 10–15 days for sample production plus 3–5 days for express courier as a planning reference. The brief and material availability can change the schedule.

How is quality specified?

Define the garment measurements and tolerances, sample approval, inspection scope, and any test method and acceptance criteria. ANSI/ASQ Z1.4 Level II with AQL 2.5 major defects is a planning reference.

Can a style use a custom yarn-dyed or technical weave?

Custom yarn-dyed, Pantone lab-dipped, or technical weave work can add 15–30 days. Confirm the order-dependent timing with the supplier.

Are organic or textile certifications included?

Certification status is not assumed. Verify current, product-specific and transaction-specific documents with the supplier before making a certified-content claim.

What are the exact import duties and sea transit times?

Those details are not specified here. Confirm applicable tariff treatment and transit estimates with qualified trade and logistics providers for the origin, destination, product, and date.

Private label planning

Scope a style for production

Share the garment type, tech pack, material direction, quantity, and target schedule for an order-specific review.

Discuss private label production