Start Your Project

Clothing Manufacturing for Irish Fashion Brands

Plan clothing production for an Irish brand with Fenalt. Review the project workflow, quality scope and customs checks for imports into Ireland.

A practical starting point for a production project

A production brief is easier to assess when the garment, quantity, material choices and delivery point are clearly described. Fenalt coordinates clothing manufacturing through a managed production process. Depending on the project, the work may include a technical review of the tech pack, material sourcing, pattern and sample development, bulk-production coordination, quality inspection and export planning.

This guide is for brands and procurement teams in Ireland considering a new collection, repeat order or product extension. It outlines what helps scope production and what to prepare when goods will be imported into Ireland from outside the European Union. It is not a customs ruling, legal opinion or final price quotation.

What to include in a production request

Send the details that are confirmed and label estimates or unresolved choices. That makes it easier to identify what can be quoted and what still depends on development.

Project inputUseful detail
ProductGarment type, knit or woven construction, intended use, reference images and special finishes
Tech packDrawings, measurement chart, construction details, bill of materials, size range and tolerances
MaterialsFibre composition, fabric weight if known, colours, trims, labels and nominated suppliers
Order planQuantity by style, colour and size; sample and bulk windows; repeat-order expectations
Quality planCritical measurements, appearance requirements, requested tests and inspection criteria
Ireland marketIntended sales channels, responsible operator and approved product-information versions
Import and deliveryImporter, destination, preferred transport mode and agreed delivery terms

If a tech pack is incomplete, list the open decisions rather than presenting them as settled. For example, distinguish a confirmed fibre blend from a fabric option that still needs sourcing. This can affect sampling, cost, product data and customs classification information.

Two public Irish apparel examples may help make a product brief more concrete: Dublin-based So Roe describes curated limited-edition drops, and BÉBHÍNN describes small-quantity knitwear made in Ireland. These are market references only; neither is identified as a Fenalt customer, supplier or partner, and their practices do not establish Fenalt production capabilities.

Fenalt's managed production workflow

Fenalt coordinates a project against the specification the buyer approves. A typical sequence is:

  1. Brief and specification review.

    Product details, quantity and open technical questions are reviewed. Missing measurements, construction details or material choices are recorded.

  2. Material and development planning.

    Material sourcing, pattern work or other development steps are scoped for the specific product. Availability and suitability need confirmation for the chosen fabric, colour, finish and quantity.

  3. Sampling.

    A sample is prepared for review against the project brief. Consolidate feedback on fit, measurements, construction and appearance so the next revision addresses the actual changes.

  4. Pre-production approval.

    The buyer confirms the sample and specification before bulk production starts. Changes after approval can affect material, cost or timing and should be documented.

  5. Bulk production and quality review.

    Production follows the approved specification and agreed quality plan. Inspection criteria should fit the garment; a sampling standard is not a promise of zero defects.

  6. Export and delivery planning.

    The route, handover point, documents and import responsibilities are agreed for the order.

Fenalt's current operating facts give planning references of 10–15 days for sample production, plus 3–5 days for shipping. Bulk production takes 15–20 days from pre-production sample sign-off to export dispatch. Confirm timing in the project quotation and production plan. These intervals exclude buyer review, unresolved material choices, customs processing and onward delivery after export dispatch.

Minimum order, sampling and quality scope

Fenalt's standard minimum order quantity is 50 pieces per style. A style is not necessarily the same as total order quantity. Describe the proposed split by style, colour, size, fabric and construction, and confirm how that mix is counted before relying on the standard minimum.

The sample stage lets a buyer check whether the written specification produces the intended garment. Measure the sample using the tech-pack method and collect feedback from everyone responsible for fit and construction approval. If a change is requested, identify whether it concerns the pattern, material, measurement chart, trim or workmanship.

Fenalt's stated inspection reference is AQL 2.5 under ANSI/ASQ Z1.4 Level II. AQL describes an inspection-sampling method; it does not guarantee zero defects or replace product-specific acceptance criteria. Agree the inspection scope, sample plan, measurement points, defect categories, records and corrective-action process before production.

Needle or metal detection can be incorporated where required by the product, buyer specification or production facility. It should not be assumed for every garment or order.

Importing apparel into Ireland

Irish Revenue explains that businesses moving goods to or from a country outside the EU must register for Customs and submit customs declarations, either directly or through an agent. Revenue identifies the commodity code as product-specific information used to determine applicable customs duties. Before shipment, the Irish importer and its customs representative should establish who is filing the declaration and what information is needed.

Prepare a precise product description, construction, fibre composition, material details, intended use and available origin information. Keep the description consistent in the tech pack, commercial invoice, packing information and freight instructions. Customs may request supporting documents such as a commercial invoice, bill of lading or airway bill, packing list, or a document required for a specific product.

Do not infer a tariff from a broad garment name. Check the current EU tariff and import measures for the correct product code, origin and import date. Preferential treatment also requires the product to satisfy the applicable origin rule and the importer to hold the required proof. Dispatching a garment from a country does not by itself establish preferential origin. This draft gives no duty percentage or preference promise.

For an Irish customs movement involving a non-EU country, Revenue's current guidance describes the EORI registration process. Confirm that the importer has the correct customs registration and that the person or broker lodging the declaration has the required authority and information. VAT, duties, customs-agent charges and other import costs should be checked for the specific transaction and agreed delivery point.

Textile composition and product information

Regulation (EU) No 1007/2011 covers textile fibre names and related labelling and marking of fibre composition. It describes how fibre-composition information is presented and requires the label or marking to use the official language or languages of the Member State where the product is made available to consumers, unless that state provides otherwise.

Before labels are produced, the brand or responsible market operator should have the fibre names, percentages, presentation and language reviewed for the product and intended channels. Do not assume that an English-only label is sufficient in every case, and do not assume Irish-language labelling is or is not required without checking the applicable rules. The exact application, exemptions and any national provisions need qualified review.

Keep reliable material and composition records so the final garment's label can be checked against its actual construction. Any claim about certification, recycled or organic content, chemical testing or product performance should be supported by current documents that apply to the specific material and order.

Shipping terms and import-cost planning

Fenalt's approved operating facts describe DAP for small-batch courier shipments and FOB Chattogram for bulk sea freight. Route and terms depend on production origin, destination, shipment size and the agreed Incoterm. These are project starting points, not a universal delivery promise.

The quotation should name the delivery point or port and state who is responsible for transport, export documents, insurance, customs clearance, duty and tax. Confirm how import costs are handled before comparing offers. The named point and cost allocation should be the same basis for each comparison. Ireland uses the euro, but Fenalt quote currency and payment terms are not fixed by the country. Ask that the quote currency, payment schedule and any milestones be stated in the written offer for the specific project.

Plan the factory schedule separately from buyer approvals, material availability, customs processing and carrier transit. Confirm sample review dates, approval deadlines, bulk production, dispatch readiness and the carrier's estimate for the actual origin, destination and booking period. A production interval does not equal a delivery date in Ireland.

Questions to resolve before production

Before approving an order, make sure the project record answers:

  • Which product specification and sample version are approved?
  • What quantity applies to each style, colour and size?
  • Which material and fibre-composition information is final?
  • What inspection criteria and corrective-action process have been agreed?
  • Who approves product labels and any translated product information?
  • Who confirms the commodity code, origin evidence, EORI details and import declaration?
  • Which Incoterm, named delivery point and import-cost responsibilities appear in the quote?
  • Which dates depend on buyer approvals, material choices or carrier booking?

Recording the answers keeps the design brief, sample approval, production and customs paperwork aligned. For a tariff, tax, label or customs determination, the buyer should consult Irish Revenue, a customs representative or a qualified product-law adviser.

Start a scoped project discussion

Share the garment category, available tech pack, quantities and intended delivery point through Fenalt's project intake. Mark unresolved decisions about measurements, material, labels and importing. Fenalt can then assess the manufacturing scope and identify the information still needed for a project-specific plan.

An initial discussion is not a final quotation, customs decision or legal approval.

Next steps: Review Fenalt's capabilities · Read about the process · Start a project brief

Official references and Irish brand examples

The brand links support only the examples above; they do not imply a relationship with Fenalt or that these brands use Fenalt for manufacturing.