Start Your Project

Drape, fit, and finishing under one brief

Custom Dress Manufacturing

Fenalt is a managed dress manufacturer for brands developing fluid slips, structured woven dresses, tailored midis, and technical jersey silhouettes.

We coordinate digital patterns, fabric sourcing, sampling, private-label trims, AQL 2.5 quality control, and export after a 50-piece-per-style MOQ.

Direct answer

From pattern digitization to export

Fenalt turns the tech pack into a managed sampling and production plan. Pattern development, fabric sourcing, compact ring-spun or sustainable blends, private-label trims, and final inspection are coordinated through one accountable production path.

Bulk production is scheduled for 15–20 days after PP approval, with AQL 2.5 inspection and DAP or FOB delivery rather than fragmented factory management.

Silhouette engineering

Dresses by block and fabric behavior

01

Structured woven

A-line, shift, shirt, and tailored midi or maxi silhouettes use interlining, darts, princess seams, collar, placket, and cuff engineering.

02

Fluid and drape-focused

Bias-cut slips, wrap dresses, tiered, and ruffled styles require grain control, tie-waist reinforcement, neckline finishing, and appropriate SPI.

03

Technical knit and jersey

Bodycon, ribbed, T-shirt, and sweatshirt dresses depend on recovery, mechanical compacting, stretch seam construction, and anti-bagging control.

Material selection

GSM and yarn set the final drape

FabricCompositionWeightHand-feelUse
Lightweight poplin100% combed cotton100–120 GSMCrisp and breathableSummer shirt dresses and tiered skirts
Viscose / rayon challis100% viscose110–130 GSMSilky, cooling, high drapeSlips and wraps
Midweight linen blend55% linen / 45% cotton150–180 GSMTextured, structured, durableDay dresses and tunics
Ponte RomaRayon / nylon / spandex280–320 GSMSubstantial and high-stretchProfessional sheath dresses
Heavyweight jersey100% organic cotton200–240 GSMSoft, opaque, durableOversized T-shirt dresses

Technical construction

Internal architecture shapes the finish

Seams, hems, zippers, interlining, and stitch density are chosen with the fabric and silhouette.

French seams

High-end sheer and lightweight fabrics receive a clean enclosed edge.

Overlock

Four- or five-thread overlock supports seam expansion in knit construction.

Blind hems

Formal silhouettes use hidden stitching where a visible hem would distract.

Hardware and SPI

YKK or equivalent invisible zippers, weight-matched fusibles, and 10–12 SPI protect durability without compromising the cloth.

Order planning

A predictable dress production calendar

  1. 01

    Technical intake and quotation

    1–3 days to review tech pack, BOM, and quantity.

  2. 02

    Sampling

    10–15 days for pattern, fabric, and prototype development.

  3. 03

    Courier shipping

    3–5 days by DHL or FedEx for client review.

  4. 04

    PP approval

    Sign off sample, grading, and labels before bulk.

  5. 05

    Bulk and release

    15–20 days for cutting, sewing, finishing, AQL 2.5, and export dispatch.

Managed quality

Check a dress where it can fail

Symmetry

Necklines, hemlines, and sleeves match.

Hem leveling

Circular or flared hems are level on a dress form.

POM

Approved size chart and standard tolerances.

Hardware

Zippers, buttons, and snaps cycle repeatedly.

Fabric integrity

Shading, torque, and tension puckering are reviewed.

FeatureFenalt managedUnmanaged direct
AccountabilitySingle point; Fenalt owns the outcomeBuyer coordinates departments
MOQ50 pieces per styleOften 300–500+
QualityMandatory AQL 2.5 Level IIVariable or third-party
LogisticsDAP / FOB integratedBuyer coordinates forwarders

Questions and answers

Dress manufacturing FAQs

What is the MOQ?

Fenalt's standard MOQ is 50 pieces per style.

Can you use sustainable fabrics?

Yes. GOTS organic cotton, Tencel Lyocell, recycled polyester, and other specified fibers can be sourced through intake.

How do you grade sizes?

Digital CAD patterns are graded to the supplied chart; Fenalt can provide a standard US or EU scale if one is not available.

What is DAP versus FOB?

DAP is used for small courier shipments to the named place excluding local duties and taxes. FOB Chattogram is used for bulk sea freight, with responsibility ending when goods are loaded on the vessel.

Do I need a professional tech pack?

A tech pack is preferred, but clear physical samples or detailed sketches can be formalized into production-ready specifications.

What tolerances apply?

Standard commercial apparel tolerances apply across POM, typically around ±0.5 inch for most dimensions depending on fabric and construction.

How long does a PP sample take?

Sample production typically takes 10–15 days followed by 3–5 days international courier shipping.

Can you add labels and hangtags?

Yes. Woven neck labels, care labels, branded hangtags, and private-label packaging can be included in the bulk BOM.

Start your dress collection

Develop the silhouette, then protect the drape

Send your block, fabric, fit, trims, quantity, and destination. Fenalt will coordinate sample approval through export.