01
Structured woven
A-line, shift, shirt, and tailored midi or maxi silhouettes use interlining, darts, princess seams, collar, placket, and cuff engineering.
Drape, fit, and finishing under one brief
Fenalt is a managed dress manufacturer for brands developing fluid slips, structured woven dresses, tailored midis, and technical jersey silhouettes.
We coordinate digital patterns, fabric sourcing, sampling, private-label trims, AQL 2.5 quality control, and export after a 50-piece-per-style MOQ.
Direct answer
Fenalt turns the tech pack into a managed sampling and production plan. Pattern development, fabric sourcing, compact ring-spun or sustainable blends, private-label trims, and final inspection are coordinated through one accountable production path.
Bulk production is scheduled for 15–20 days after PP approval, with AQL 2.5 inspection and DAP or FOB delivery rather than fragmented factory management.
Silhouette engineering
01
A-line, shift, shirt, and tailored midi or maxi silhouettes use interlining, darts, princess seams, collar, placket, and cuff engineering.
02
Bias-cut slips, wrap dresses, tiered, and ruffled styles require grain control, tie-waist reinforcement, neckline finishing, and appropriate SPI.
03
Bodycon, ribbed, T-shirt, and sweatshirt dresses depend on recovery, mechanical compacting, stretch seam construction, and anti-bagging control.
Material selection
| Fabric | Composition | Weight | Hand-feel | Use |
|---|---|---|---|---|
| Lightweight poplin | 100% combed cotton | 100–120 GSM | Crisp and breathable | Summer shirt dresses and tiered skirts |
| Viscose / rayon challis | 100% viscose | 110–130 GSM | Silky, cooling, high drape | Slips and wraps |
| Midweight linen blend | 55% linen / 45% cotton | 150–180 GSM | Textured, structured, durable | Day dresses and tunics |
| Ponte Roma | Rayon / nylon / spandex | 280–320 GSM | Substantial and high-stretch | Professional sheath dresses |
| Heavyweight jersey | 100% organic cotton | 200–240 GSM | Soft, opaque, durable | Oversized T-shirt dresses |
Technical construction
Seams, hems, zippers, interlining, and stitch density are chosen with the fabric and silhouette.
High-end sheer and lightweight fabrics receive a clean enclosed edge.
Four- or five-thread overlock supports seam expansion in knit construction.
Formal silhouettes use hidden stitching where a visible hem would distract.
YKK or equivalent invisible zippers, weight-matched fusibles, and 10–12 SPI protect durability without compromising the cloth.
Order planning
1–3 days to review tech pack, BOM, and quantity.
10–15 days for pattern, fabric, and prototype development.
3–5 days by DHL or FedEx for client review.
Sign off sample, grading, and labels before bulk.
15–20 days for cutting, sewing, finishing, AQL 2.5, and export dispatch.
Managed quality
Necklines, hemlines, and sleeves match.
Circular or flared hems are level on a dress form.
Approved size chart and standard tolerances.
Zippers, buttons, and snaps cycle repeatedly.
Shading, torque, and tension puckering are reviewed.
| Feature | Fenalt managed | Unmanaged direct |
|---|---|---|
| Accountability | Single point; Fenalt owns the outcome | Buyer coordinates departments |
| MOQ | 50 pieces per style | Often 300–500+ |
| Quality | Mandatory AQL 2.5 Level II | Variable or third-party |
| Logistics | DAP / FOB integrated | Buyer coordinates forwarders |
Questions and answers
Fenalt's standard MOQ is 50 pieces per style.
Yes. GOTS organic cotton, Tencel Lyocell, recycled polyester, and other specified fibers can be sourced through intake.
Digital CAD patterns are graded to the supplied chart; Fenalt can provide a standard US or EU scale if one is not available.
DAP is used for small courier shipments to the named place excluding local duties and taxes. FOB Chattogram is used for bulk sea freight, with responsibility ending when goods are loaded on the vessel.
A tech pack is preferred, but clear physical samples or detailed sketches can be formalized into production-ready specifications.
Standard commercial apparel tolerances apply across POM, typically around ±0.5 inch for most dimensions depending on fabric and construction.
Sample production typically takes 10–15 days followed by 3–5 days international courier shipping.
Yes. Woven neck labels, care labels, branded hangtags, and private-label packaging can be included in the bulk BOM.
Start your dress collection
Send your block, fabric, fit, trims, quantity, and destination. Fenalt will coordinate sample approval through export.